LNG Hrvatska

Omišalj, 22nd April 2024—The 90. LNG carrier ‘Mol Hestia’ has arrived at the LNG Terminal. All safety checks have been completed, and cargo transfer operations from the LNG carrier to the FSRU vessel ‘LNG Croatia’ are underway. LNG carrier ‘Mol Hestia’ will leave the Terminal and Special Purpose Port area on 25th April 2023 in the afternoon. Since the beginning of the commercial operation of the UPP Terminal, more than 12,282,922 cubic meters of liquefied natural gas have been safely and reliably transshipped and gasified, and over 7,425,000,000 cubic meters of natural gas have been shipped to the transport system of the Republic of Croatia.