LNG logo
EN HR
dropdown-icon
english-flag
croatian-flag
Home > News > LNG Terminal systems are currently being tested

LNG Terminal systems are currently being tested


Omišalj, 23rd December 2020 - We hereby inform all interested public that upon arrival of the FSRU vessel 'LNG Croatia' at the location of the LNG Terminal, testing procedures for all technological systems of the vessel, and the onshore part of the Terminal have started. In line with above mentioned, FSRU vessel’s systems are being tested, in all operating modes, which sometimes include testing during night hours.

In order to verify the full functionality of the system, systems that operate only in emergency, i.e., those systems that will not work in daily operations of the Terminal, and which can be a source of a certain noise level, are currently being tested.

In addition, LNG Croatia LLC is actively working to reduce the noise level from the Terminal to a minimum during testing period, especially during night hours, all to enable quality coexistence with the local community.